Our Projects & Industry Experience
Manpower Supply Malaysia has supported a range of construction, engineering, electrical, mechanical, and data centre projects across Malaysia. Through our manpower supply and subcontracting partnerships, we provide skilled personnel and technical support for projects of different sizes and requirements.
Our project experience includes collaborations with established industry partners, supporting activities such as cable installation, electrical works, mechanical piping, testing, commissioning, splicing, and instrumentation.
Our Ongoing & Completed Projects
We continue to support active projects while building on our experience from successfully completed assignments. Our workforce and subcontracting capabilities allow us to support diverse project requirements across multiple industries.
Ongoing projects and active partnerships
The following partnerships and assignments are listed as ongoing or active based on the project information provided.
1. IEM Dynamic Sdn. Bhd.
Project locations: OSRAM Kulim, Kedah (2023); Bindu, Ganser and Bebok (2024); Basil, Kuantan (2026).
Activities: Cable trunking, cable trays, cable ladders, GI conduit installation, cable glanding, termination and instrument device installation.
2. Emerge Multitech Sdn. Bhd.
Projects: GDS, DayOne Gelang Patah, K2, BDC Sedenak, YTL Kulai, Google Data Centre KL, Sunway Bukit Jalil and EXIM Data Centre.
Activities: Cable tray and trunking installation, GI conduit, cable pulling, testing and splicing.
3. Reliance Engineering Sdn. Bhd.
Projects: Infineon Kulim (2023) and Intel 12, Penang (2024–2026).
Activities: Mechanical pipe installation.
4. Rasa Construction Sdn. Bhd.
Project: Masjid Kota Asas.
Activities: Pipe installation, structural works and welding.
5. Quadconnect
Project: DayOne Kempas (2026).
Activities: Splicing, testing, cable dressing and troubleshooting.
6. Onnic
Projects: DayOne Kempas and DayOne Gelang Patah (2026).
Activities: Testing and splicing.
7. EZV Services Sdn. Bhd.
Projects: K2 Data Centre, Sedenak, Bridge Data Centre Sedenak, YTL Green Data Centre Kulai and Yondr Data Centre Sedenak.
Activities: Cable patching, testing and splicing.
8. Winspeed Network Sdn. Bhd.
Project: ByteDance GDS-NTP-H Project, MYJHBBDC02-H1.
Activities: Unboxing, cable tidying, patching and AOC labelling.
9. JML Marketing Sdn. Bhd.
Projects: DayOne Kempas, BDC, GDS and YTL.
Activities: Cable pulling, testing, splicing and termination.
Completed Manpower Supply Assignments
These assignments represent previous project engagements and completed service periods.
1. Volat Sdn. Bhd. · 2023–2024
Project: OSRAM.
Activities: Electrical works, power and lighting installation, cable ladders, trunking, cable trays, GI conduit and panel installation.
2. Bakat Industries Sdn. Bhd. · 2023–2024
Project: OSRAM.
Activities: Power cable termination, instrument cable termination and PIC panel device installation.
3. MIE · Mid-2023–2024
Project: Intel 8, Kulim, Kedah.
Activities: Mechanical pipe installation.
4. COMO Sdn. Bhd. · 2024–2025
Project: YTL Kulai, Johor.
Activities: Cable pulling, testing and splicing.
5. Power Services and Engineering Sdn. Bhd. · January 2025–2026
Project: Google Data Centre.
Activities: Electrical and instrumentation works, cable pulling and testing.
6. Infinity E&I Engineering Sdn. Bhd. · 2025–2026
Project: DayOne Gelang Patah, Johor.
Activities: Power cable termination.
7. Yakienno Morphin Sdn. Bhd. · 2025–2026
Projects: Yondr, YTL and Green Data Centre.
Activities: Data cable patching, dressing and labelling.
8. TGW Solution Sdn. Bhd. · 2026
Project: DayOne KTP.
Activities: Electrical works.
Subcontracting Projects
In addition to manpower supply, we undertake subcontracting assignments, supporting specialized technical activities across data centre, electrical, cabling, and infrastructure projects. Our subcontracting experience includes the following industry partners:
1. EZV Services Sdn. Bhd. · 2024–Present
Projects: K2 Data Centre, Sedenak, Bridge Data Centre Sedenak, YTL Green Data Centre Kulai, and Yondr Data Centre Sedenak.
Activities: Patching, testing, and splicing works.
2. Winspeed Network Sdn. Bhd. · 2024–Present
Project: ByteDance GDS-NTP-H Project MYJHBBDC02-H1.
Activities: Unboxing, cable tidying, AOC patching, and labelling.
3. JML Marketing Sdn. Bhd. · 2023–Present
Projects: DayOne, Kempas, BDC, GDS, and YTL.
Activities: Cable pulling, testing, splicing, and termination works.
4. Bakat Industries Sdn. Bhd. · 2026
Project: Infineon Melaka.
Activities: Electrical and instrumentation works.
Supporting Projects Across Malaysia
From data centres and industrial facilities to construction and infrastructure developments, our project experience reflects our commitment to providing dependable manpower and technical support. We continue to work with industry partners to meet changing workforce demands and contribute to successful project execution.
Need manpower or subcontracting support for your next project?